Fire Protection Works

We install fire suppression, firefighting support, alarm and evacuation systems. Our fire protection projects include schools, healthcare facilities and military facilities.

Fire protection example: fire pumps, red suppression piping and a water tank

From water supply to suppression points

From water supply to suppression points123
  1. Water supply

    Review storage and supply conditions, suction pipework and pump connections.

  2. Pumps & valves

    Review pump-room layout, valve access and pressure-check locations.

  3. Suppression pipework

    Coordinate floor pipework and head positions with compartments and ceiling finishes.

A schematic of components and review points, not an engineering or equipment-layout drawing.

Main scope of work

  • Fire suppression systems

    Sprinklers, indoor hydrants and other systems that put out fires. Pipe routes in ceiling voids, head positions relative to finishes and access to valves are reviewed against the design documents. When room layouts or ceiling heights change, the first question for the designer is whether existing equipment can stay as it is.

  • Firefighting support systems

    Standpipe connections, smoke control and other systems that support firefighters on site. Besides equipment and pipes, the work can involve building compartments, ductwork, power supply and control signals. Agreeing each trade’s responsibilities and connection points before work begins is important.

  • Fire alarm systems

    Detectors, manual call points, control panels and alarm devices that carry a fire signal. When an existing facility is extended, the circuits in the new area and their connection to the existing control panel are reviewed together. How to keep systems working in occupied areas also belongs in the schedule.

  • Evacuation systems and upgrades to existing facilities

    Exit signs, evacuation equipment and other systems that help people leave a building. When doors or partitions change, escape routes and equipment positions need another review. Actual positions and specifications follow approved drawings and applicable standards, and in existing buildings occupant routes are kept apart from work areas.

Site example

Connecting fire systems for a classroom extension

An example in which classrooms are added while the existing school building stays in use. It is not a record of work or inspection results at any particular school.

  1. Site conditions

    Fire pipes and alarm circuits for the new classrooms must connect to existing systems. Areas used by students are kept separate from the work area.

  2. Design review

    With the responsible designer, review new sprinkler head positions against ceiling finishes, where pipes pass through, and how the new area links to the existing control panel. System capacity and applicable standards remain design review items.

  3. Work coordination

    Work that affects existing systems is timed with the facility manager. Before connections are made, agree how areas with systems out of service will be managed and how restoration will be confirmed.

  4. Example check records

    Revised drawings, photographs of connections, and test and check items, organised by area. Actual inspection and acceptance follow the approval conditions for the project.

Selected projects

Projects by year
Listed yearProjectTradeFacility type
2025New high school dormitory, mechanical and fire protection worksMechanical & fire protectionSchool
2025New senior welfare facility in Gimpo, mechanical and fire protection worksMechanical & fire protectionWelfare facility
2024New hospital clinical building, mechanical and fire protection worksMechanical & fire protectionHealthcare
2024Military facility fire protection works (package)Fire protectionMilitary facility
2024New neighbourhood facility, mechanical and fire protection worksMechanical & fire protectionRetail, neighbourhood and office

View all projects

Main equipment

  • Heat detector testers
  • Smoke detector testers
  • Discharge pressure gauges
  • Insulation resistance testers
  • Hydrostatic test pumps

Fire Protection Works enquiries

Send us the building use, fire protection drawings, specifications and the systems to be installed or replaced. Also tell us whether the building will be in use during the works and the schedule of other trades.